Dredge cattails1/19/2024 For the past six months, city leaders have met on a bi-weekly basis with the engineering firm to receive updates on the project. To complete the preliminary design at a cost of $339,000. “It appears there will be up to 2 million cubic yards of sediment and dirt that will need to come out of the lake.”Ĭity Council tabbed Minnesota-based Barr Engineering But this is preliminary designing, so none of this is concrete,” Everson said, noting the preliminary design is set to wrap up in January 2022. “It looks promising, and it’s starting to come together. And that number has come out to be roughly $15 million, which Mayor Bob Everson said is “within reach” for the city to take on. Perhaps the most anticipated aspect of the preliminary dredging design that’s been underway since spring is identifying a price tag to dredge Lake Mitchell. City leaders have a clearer picture of the costs and construction work needed to pursue a Lake Mitchell dredging project.
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |